Ingersoll, ON
In 2020, a 5,200 sq. ft. renovation of the existing office area was completed, within the larger 24,000 sq. ft. space. The main level of the POW Engineering office was modernized, including offices, reception, elevator, board room, staff kitchen and lunch area, staff change rooms and washrooms. The existing space, on the second floor, was renovated to better serve the office space.